Scaffold Shrink Wrap Installation
Rhino offer a range of Scaffold Shrink Wrap Installation services across the globe. By providing a full ‘supply & fix’ service, we are using our own products day in and day out and this helps us have a great knowledge of our products and the challenges of our customers on site.
Our teams, who are all based in the centre of the UK, erect screens, partitions, suspended ceiling covers and tunnels on a diverse range of industrial and construction sites around the UK. All hold CSCS cards, IPAF certificates and are harness trained (including the ‘Gotcha’ rescue system).
Our supervisors are qualified under the Site Supervisors Safety Training Scheme.
Before arranging for a Scaffold Shrink Wrap Installation to take place, please consider the following:
- Ensure the weather conditions are suitable – less than 10mph wind and no rain.
- Ensure a hot works permit is in place – the heat shrink process uses a naked flame so a hot works permit will need to be in place before any works can be carried out.
- Ensure that the scaffold has been completed and inspected by a competent person.
- Ensure that safe access is available to all parts of the scaffolding that require sheeting. Boarded lifts with handrails enable the sheeter to comfortably reach and touch the sheet so bare this in mind.
- Ensure that nothing is stored/stacked on the lifts as this stops sheeting being welded/shrunk.
- Ensure that scaffold structure and scaffold boards are flush and do not protrude. Fittings can pierce the shrink wrap.
- A horizontal tube (ledger) is required at the highest and lowest point of the area to be sheeted. For best results, fix on the outside of the scaffold with a single coupler (wraparound). Alternatively, the shrink wrap can be battened to the inside of a toe board or build the scaffold off a board.
Alternatively, why not look at installing the shrink wrap yourself? We offer all the required equipment and materials needed as well as an extensive learning centre providing you with all the information you need to begin shrink wrapping.